BROWN HOUSE

The site presented a number of considerations, being steeply sloping, having limited access to all sides for construction, and being within a conservation area. An innovative structural solution allowed the building to be constructed over two phases, in a safe controlled manner, and with cost certainty for the client. The building utilises a “whole building ventilation system”, which provides fresh tempered air throughout the year in an energy efficient manner, and combined with the under floor heating, provides clear wall surfaces and greater freedom in furnishing the interior